Plug Counting Packaging Machine with European Hole
Parameter

WE-LS2  Plug Counting Packaging Machine with European  Hole

 

We are a manufacturer in China and specialized in counting packaging machine for 14 years !

Our machine is able to pack the screws bolt nut hardware or plastic spare parts  …into the bag box carton.

Furniture accessories package machine

Screws packaging machine

Hardware accessories packaging machine

Fasteners packaging machine

Weighing packaging line

Plug packing machine

 

 

It’s fully automatic counting and packing machine for Furniture kit and hardware spare parts like screw , bolt, nut , washer, spring, plug.High precise and fast , save the labor cost for you. Widely used in fasteners , hardware, furniture, bathroom filed.

You only need to put the spare parts into the hopper and roll film on the packing machine, set in the quantity that you need to in bag and open the machine. Machine will automatic counting the spare parts and make the film to be bag , filling the spare parts into bag , sealing and cut . Lot number or other printing information is optional device.

Parameter

 

Speed

10-60bag/min

Counting range

0~100000

Pouch size

L40-160、(W30-110mm

Film width

220mm

Film thickness

0.03~0.10mm

Gas consumption

0.03/ min

Pressure

0.5-0.7Mpa

Sealing type

Pillow sealingside sealing with europe hole or chain bag

Power

2000W

Net/gross wt

300kg/400kg

Voltage

220V380V/50hz/60hz

Pack material

OPP/CPPOPP/PE MST/PE PET/PE

Demension

L1200×W1000×H1600mm

 

Sample
Video
Features

WE-LS2 Plug counting packaging machine

1. According to screw/special parts sample tailored to the vibration plates with precise count control device, to ensure that every bag is accurate and correct.

2. Adopts pneumatic structure, whole machine is more secure, stable, reliable.
3. Advanced PLC control system and various automatic alarm protection functions, convenient for daily maintenance and reduce wastage.
4. It completes the whole procedure of metering, filling,bagging,date printing, charging(exhausting),counting automatically.
5. Unique design of the packing seal technology, make the sealing nice and strong.

6. Equipped with chain conveyor trailer,it can be feed by manual if the vibration plates is un-workable.

 

 

Engineer Team

Process

Customer

 

Installation Service

1.we provide videos and instruction manual to show the process of installation.

2.we provide training for installation for free in our factory.

3.we can send technician to buyer’s factory to install the machine and provide trainning course.

After Sales Service

1.One year warranty and free lifetime technique support.

2.Free spare parts would be supplied if machine broken within warranty period.

3.After the warranty period, the spare parts for replacement are offered based on certain charge.

 

Repair

Pls filling oil in the hole and gear injection position on time.
Reducer is prohibited for working without oil, For the first time ,machine need to change the lubrication to swim after working for 40 hours .Then keep to change every 3 month .

lubricating oil

Environment Temperature

 lubricating oil

-5℃–50℃

Gear oil – 20 or HL – HL 50 machine oil

-40℃

Gear oil – 30 HL or HL – 50 machine oil


Pls clean the machine after finishing using everyday,clean the packing items to avoid humid and affect the next working performance.

Pls check the fasten screw on time to ensure the stable working.

Pls keep the photoelectric clean.

Electrical parts should be paid attention to moisture proof and Dust.

Maintenance and Repair

 After a long time using please add gear oil or grease to the engine parts.

 Gearbox No-oil operation is strictly forbidden, running for the first time after a 40-hour, it need  to replace lubrication, then every oil change for three months.

Every day after producing, please clean the dust and the rubbish on/inside or around the machine.

Make sure that the machine at a dry place without moisture.

For the Air booster, please keep it clean without dust and water.

Make the screws are tied up before producing, especially the screws of the vibration plate.

Keep the electronic eye/color marker and the lights lean, without no dust.

Safe first, make sure you operate the machine at a safe situation.

General equipment maintenance includes routine maintenance, scheduled maintenance, periodic inspection and precision inspection, lubrication and cooling system maintenance is also an important element of equipment maintenance.

Equipment daily maintenance work is the foundation of equipment maintenance, must be institutionalized and standardized. Equipment maintenance work on a regular basis to develop fixed material consumption fixed, tested and fixed equipment maintenance work on a regular basis should be included in the contract responsibility system of workplace assessment.

 

Simiar Product:Hardware Counting Machine