High Speed Cartoning Machine

The high-speed cartoning machine has a faster packaging speed from 100~150 carton /min according to carton style, it saves a lot of workers for the customer and improves the packaging quality and production efficiency.

High-Speed Cartoning Machine

The high-speed cartoning machine for packing all kinds of products into cartons at high speed, such as soap, food,  cosmetics, electronic products, hardware parts, etc, is mainly used for Tuck End Cartons and Seal End Cartons.

Parameter

Name High-speed cartoning machine
Voltage 380V  50-60Hz
Power 3.5KW
Speed 100-150 cartons/min
Carton Size Range
(Able to be customized)
L160-85 * W95-50 * H80-30 mm
If the carton’s width and length are the same, it’s not safe for the machine to open the carton.
Requirement for carton 250-350g/m2, carton indentation is not less than 0.4mm, with pre-folding effect
Air compressor 0.5-0.7Mpa     15-20 m3/h
Net Weight 2000KG
Dimensions L5500XW1900XH2000mm

Equipment Feature

  1. Use the servo motor to ensure the machine’s stable performance.
  2. Speed is from 100~150 cartons/min according to carton style.
  3. Add an electric eye to detect the goods so no goods then not pick the carton, avoid empty cartons.
  4. Carton store shelf able to store large capacity cartons, adjustable frame for different size cartons.
  5. Stato light, alarm when machine malfunctions or lacks cartons.
  6. For the carton material suggested 250-350g/m2, carton indentation is not less than 0.4mm, with pre-folding effect, it’s very important to ensure smooth carton forming and good loading.

Video

Installation Service

1. We provide videos and an instruction manual to show the installation process.

2. We provide training for installation for free in our factory.

3. We can send a technician to the buyer’s factory to install the machine and provide a training course.

After Sales Service

1. One-year warranty and free lifetime technique support.

2. Free spare parts would be supplied if the machine has broken within the warranty period.

3. After the warranty period, the spare parts for replacement are offered based on a certain charge.